Beit Al Watan Fourth Settlement Fifth Settlement k125 Project

Beit Al Watan Fourth Settlement Fifth Settlement k125 Project

project K125 is located in the Fourth Settlement, Beit Al Watan, on a 25-meter wide street with a north-facing classic design.
The project consists of a ground floor and 3 repeated floors, with two units on each floor.
-    Project Location in Fourth Settlement, Beit Al Watan:
1-    The project is located near the Clubs’ Axis, which includes some of the largest clubs such as "Al Ahly Club Fifth Settlement Branch" and "Police Club".
2-    Close to the "view zone" service area.
3-    Near to Al Marasem and Palm Hills compounds.

-    Spaces and Delivery Date:
Spaces start from 165 m for the ground floor 
and 208 m for the repeated floors.
Project delivery date: 12/2024.

  • Project Status: In Progress
  • Project district:Fourth District Beit Al Watan
  • Project Type:Residential,apartment
  • Project delivery:2024-12-31
  • Number of floors:4
  • space available: 224 M

Features


Beit Al Watan Fourth Settlement Fifth Settlement k125 Project project K125 is located in the Fourth Settlement, Beit Al Watan
Central Receiver
Beit Al Watan Fourth Settlement Fifth Settlement k125 Project project K125 is located in the Fourth Settlement, Beit Al Watan
Luxury Entrances
Beit Al Watan Fourth Settlement Fifth Settlement k125 Project project K125 is located in the Fourth Settlement, Beit Al Watan
Garage
Beit Al Watan Fourth Settlement Fifth Settlement k125 Project project K125 is located in the Fourth Settlement, Beit Al Watan
Elevator
Beit Al Watan Fourth Settlement Fifth Settlement k125 Project project K125 is located in the Fourth Settlement, Beit Al Watan
Fingerprint
Beit Al Watan Fourth Settlement Fifth Settlement k125 Project project K125 is located in the Fourth Settlement, Beit Al Watan
Security Guards
Beit Al Watan Fourth Settlement Fifth Settlement k125 Project project K125 is located in the Fourth Settlement, Beit Al Watan
classical interface
Beit Al Watan Fourth Settlement Fifth Settlement k125 Project project K125 is located in the Fourth Settlement, Beit Al Watan
Equipped water tanks
Beit Al Watan Fourth Settlement Fifth Settlement k125 Project project K125 is located in the Fourth Settlement, Beit Al Watan
Water filter preparation
Beit Al Watan Fourth Settlement Fifth Settlement k125 Project project K125 is located in the Fourth Settlement, Beit Al Watan
Air conditioning
Beit Al Watan Fourth Settlement Fifth Settlement k125 Project project K125 is located in the Fourth Settlement, Beit Al Watan
Security Camera
00

Days

00

Hours

00

Minutes

00

Seconds

.

Concrete structure
10 %
Interior finishes
10 %
Facade finishes and entrances
15 %

Overall Progress

You need more information about our price?

Related Projects

Details Beit Al-Watan, the first district, project B117
Details Beit Al-Watan, the third district, project m110 The project is located on a street with a width of 36 m, with a seafront
Details Beit Al Watan, in First Settlement, Project i17
Details fourth district of Beit El Watan, Project C166 is located in the fourth district of Beit El Watan

fourth district of Beit El Watan, Project C166

New Cairo - BEIT EL-WATN
09.
Details Project D80 in Fifth Settlement Beit El Watan is located in Fifth Settlement Beit El Watan

Project D80 in Fifth Settlement Beit El Watan

New Cairo - BEIT EL-WATN
12.
Details Beit Al Watan
Details E66 Project in Fifth Settlement, Beit Al Watan, Fifth Settlement

E66 Project in Fifth Settlement, Beit Al Watan

New Cairo - BEIT EL-WATN
16.

Subscribee

Want to be notified about our News. Just sign up and we'll send you a notification by email.

Get In Touch